Home Construction
  • EN
  • DE
  • F
  • I
  • US
  • H

Construction

CONSTRUCTION


All PAVE EDGE products are quickly and firmly bedded using 30cm nails which can be shipped with your order. The diagrams below show the dimensions and instructions for use of PAVE EDGE.

starr_enr
light_enr

1. Cut to Length


  • Sections come in 2.0m - 2.5m lengths
  • Saw can be used for shorter
  • Far quicker than with metal edging

cutl

2. Join Sections


  • Join sections longer than 2..5m 
  • Use circular connecting rods
  • These are provided FREE
  • Allows seamless transitions
  • Strength is preserved
joinl

3. Fix in Place


  • Line up edges using string line
  • All PAVE EDGE needs is a hammer
  • Requires 30cm masonary nails
  • These can also be delivered
  • Amount of nails specified here
fixl

4. Bed Area with Sand/Gravel Mix


  • Take time to prepare a good base
  • Use dense material including sand
  • Run plate compacter over base
  • Ensure that it is smooth
bedl

5. Lay Paving Stones


  • Start from a permanent edge
  • Place pavers gently
  • Do NOT use a hammer 
  • Use string line to keep pattern
layl

6. Compact Paved Area


  • Spread sand over paved area
  • Sweep sand into joints
  • Run over area with plate compacter
  • Repeat 2-3 times
compactl

More...


A complete and detailed set of installation instructions can be found here.


Sebastian Müller AG
Bohler
Postfach
CH-6221 Rickenbach
Tel. +41 41 932 01 01

SMAG_Logo

logo_pavetech